CPG NORTH AVENUE PIPELINE PROJECT UPDATES Richli Water would like to inform the public that concrete pouring on the second half of the road cut at Lower Sto. Niño Street corner CPG North Avenue was done on September 25, 2024. This portion will be closed from September 25 to October 09 to make sure that the concrete is cured properly and the desired strength is met. Removal of traffic safety devices will be done on October 10, 2024, during which the full width of the road can be used by the traveling public. Until then, traffic disruption will still be experienced in the area. We request everyone to bear with us during this time. Thank you so much for understanding.
Posted on: Friday 4th of October 2024