Starting September 2024, we will no longer be sending our billing statements to your physical address. Instead, we will be switching to digital notifications via email, Messenger/Viber, or text message. To ensure a seamless transition, we kindly request that you update your contact information with us by providing your current email address and preferred contact number (Viber/Text message). This will enable us to keep you informed about your billing updates and other important notifications. Please send your updated contact information to us at billing@richlicorp.com or +639703813546 as soon as possible.
Posted on: Tuesday 6th of August 2024
By: Richli Water Inc.
To our valued consumers, Please be informed that the Admin Team will be conducting INTERCONNECTION WORKS of newly installed pipeline at Graham Avenue corner Gasanai Street, Booy, Tagbilaran City. The subject area will experience low to no water supply during the interruption schedule. DATE: August 20, 2024 TIME: 05:00 PM until 12:00 MN AFFECTED AREAS: Gasanai Street, Pamaong Street Interconnection of 3-inch Pipelines (Expansion of RICHLI Water Pipeline) We sincerely apologize for the inconvenience this will cause you. We request your patience and understanding on this matter. Rest assured that the water supply will be back to normal once the interconnection work is done.
Posted on: Thursday 1st of August 2024
By: Richli Water Inc.
To our dear consumers, Please be noted that the interconnection schedule written below will be moved to August 8, 2024. Thank you and be guided!
Posted on: Tuesday 30th of July 2024
By: Richli Water Inc.
To our valued consumers, Please be informed that Admin Team will be conducting INTERCONNECTION WORKS works of newly installed pipeline at Graham Avenue corner Belderol Street, Cogon, Tagbilaran City. The subject area will experience low to no water supply during the interruption schedule. DATE: August 06, 2024 TIME: 05:00 PM until 12:00 MN AFFECTED AREAS: Belderol Street, Cogon, Tagbilaran City Interconnection of 3-inch HDPE Pipelines (Expansion of RICHLI Water Pipeline) We sincerely apologize for the inconvenience this will cause you. We request your patience and understanding on this matter. Rest assured that the water supply will be back to normal once the interconnection work is done.
Posted on: Tuesday 30th of July 2024
By: Richli Water Inc.
NOTICE OF WATER SERVICE INTERRUPTION To our valued consumers, Please be informed that Admin Team will be conducting the INTERCONNECTION OF REVAMPED PIPELINES along Suarez Street, Poblacion 3, Tagbilaran City in line with the on-going road concreting done by the City Engineer’s Office through its contractor - Impreza Construction. The subject area will experience low to no water supply during the interruption schedule. DATE: August 03, 2024 TIME: 05:00 PM until 12:00 MN AFFECTED AREAS: Suarez Street, Espuelas Street, Espuelas Loop, & Bagong Lipunan Street Interconnection of Revamp Pipelines (Maintenance) We sincerely apologize for the inconvenience this will cause you. We request your patience and understanding on this matter. Rest assured that the water supply will be back to normal once the interconnection work is done.
Posted on: Saturday 27th of July 2024
By: Richli Water Inc.
NOTICE OF WATER SERVICE INTERRUPTION To our valued consumers, Please be informed that Admin Team will be conducting an EMERGENCY LEAK REPAIR of our damaged 3-inch distribution pipeline along C. Mag-aso Street, Booy District, Tagbilaran City. The subject area will experience low to no water supply during the interruption schedule. DATE: July 27, 2024 TIME: 02:00 PM until 12:00 MN AFFECTED AREAS: C. Mag-aso Street, G. Tanguenca Street, and O. Zamora Street, Booy Leak Repair of Damaged 3-inch Pipeline (Emergency Repair) We sincerely apologize for the inconvenience this will cause you. We request your patience and understanding on this matter. Rest assured that the water supply will be back to normal once the repair works is done.
Posted on: Saturday 27th of July 2024
By: Richli Water Inc.
To our valued customers, As of 7:00 AM today, our Water Treatment Plant has RESUMED its operation. We have managed to operate 4 hours earlier than our estimated time of completion. For now, our water pressure is already building up which will normally take up to 8 hours depending on the area. Our team will be working 24/7 in releasing airlocks to increase the water pressure as soon as possible. We understand your frustrations but please know that we are doing our best to recover the water supply as early as we can. Thank you for your understanding.
Posted on: Saturday 20th of July 2024
By: Richli Water Inc.
UPDATES ABOUT THE EMERGENCY PLANT SHUTDOWN
Posted on: Friday 19th of July 2024
By: Richli Water Inc.
TO OUR DEAR CONSUMERS: As of 9:00 AM today, we regret to inform you that we will be shutting down our Malingin Water Treatment Plant due to ongoing trouble shooting efforts at the intake electrical & instrumentation system, where faults have been identified. This shutdown is necessary to ensure the safety and integrity of our operations and to prevent any potential harm to our customers or our equipment. As a result of this shutdown, there will be a complete power interruption to the plant, and we will not be able to produce treated water during this time. We understand the inconvenience this may cause and are working diligently to resolve the issue as soon as possible. We will provide regular updates on the status of the repair work and notify you as soon as normal operations resume. In the meantime, we appreciate your patience and understanding. Please note that this shutdown is expected to last until further notice, and we will do our best to provide an estimated time for when the plant will resume operations. Thank you for your cooperation.
Posted on: Friday 19th of July 2024
By: Richli Water Inc.