RW RW
×







ADVISORIES

blog

Advisories

NOTICE OF WATER SERVICE INTERRUPTION (TAGBILARAN CITY AREA)

To our valued consumers,

Please be informed that the Admin Team will be conducting an EMERGENCY LEAK REPAIR of our damaged 3-inch distribution pipeline along C. Mag-aso Street, Booy District, Tagbilaran City.

The subject area will experience low to no water supply during the interruption schedule.

DATE: January 08, 2025
TIME: 10:00 AM until 05:00 PM
AFFECTED AREAS: C. Mag-aso Street, G. Tanguenca Street, and O. Zamora Street, Booy
ACTIVITY: Emergency Leak Repair of Damaged 3-inch Pipeline(Emergency Repair)

We sincerely apologize for the inconvenience this will cause you. Please know that this interruption is an EMERGENCY and not scheduled which is the reason why we were not able to inform you ahead of time. We request your patience and understanding on this matter. Rest assured that the water supply will be back to normal once the repair works is done.

Posted on: Wednesday 8th of January 2025
By: Franz Tura

blog

Advisories

PUBLIC ADVISORY Emergency Plant Shutdown December 14, 2024 (UPDATES)

PUBLIC ADVISORY
Emergency Plant Shutdown
December 14, 2024
(UPDATES)

At around 10:00 AM, we resumed start-up but the intake flow was unable to reach the Water Treatment Plant. Several observations had been made at around 10:30 AM, intake pump 2 cavitation was observed as well as intake pump 1. We decided to shut down the intake pump and concluded to replace the intake 1 pump with the newly purchased pump.

ESTIMATED TIMELINE OF ACTIVITIES:
1. Emptying intake dug well (2 hours) - 2:00 PM (Estimated Time of Completion)
2. Replacing Intake 1 pump (1 hour) - 3:00 PM (Estimated Time of Completion)
3. Termination of Electrical Wiring for pumps (1 hour) - 4:00 PM (Estimated Time of Completion)
4. Testing and Commissioning of pumps (1 hour) - 5:00 PM Estimated Time of Completion)
5. Build up sedimentation level then start up at Booster pump (3 hours) - 8:00 PM Estimated Time of Completion)

Hopefully, by 8:00 PM, we can resume our WTP operations. The provided timeline of activities is conditional. This may change depending on the time of completion of every activity. No worries, we will do our best to compress the estimated time of completion at it’s earliest. We request your patience and understanding on this matter. Thank you very much for your advance support and cooperation.

Posted on: Saturday 14th of December 2024
By: Franz Tura

blog

Advisories

PUBLIC ADVISORY Emergency Plant Shutdown

PUBLIC ADVISORY
Emergency Plant Shutdown
December 14, 2024
(All Distribution Areas)

To our valued consumers,

This is to inform you that at exactly 6:00 AM today, we have conducted an EMERGENCY PLANT SHUTDOWN in our Malingin Water Treatment Plant due to the ongoing tracing of a leak in our IPS pipeline. Our team is currently working on troubleshooting and will immediately work on repairs once the leakage is traced. The EMERGENCY INTERRUPTION will last until FURTHER NOTICE. We will keep you posted for updates.

We request your patience and understanding on this matter. Thank you very much for your advance support and cooperation.

Posted on: Saturday 14th of December 2024
By: Franz Tura

blog

Advisories

NOTICE OF WATER SERVICE INTERRUPTION - Tagbilaran City

To our valued consumers,

Please be informed that the Admin Team will be conducting INTERCONNECTION WORKS of our newly installed pipelines located along Palma Street, Poblacion 2, Tagbilaran City.

The subject area will experience low to no water supply during the interruption schedule.

Date: December 11, 2024

Time: 05:00PM until 12:00MN

Affected Areas:
NO WATER SUPPLY - Tagbilaran Community Hospital, Gov. Celestino Gallares Memorial Hospital, BQ Mall, Lite Port Center, Metrocentre Hotel, M. Torralba Street, M. Parras Street, G. Vissara Street, C. Gallares Street

Activity: Interconnection of 3-inch Pipelines

We sincerely apologize for the inconvenience this will cause you. We request your patience and understanding on this matter. Rest assured that the water supply will be back to normal once the interconnection work is done.

Posted on: Wednesday 4th of December 2024
By: Franz Tura

blog

Advisories

NOTICE OF WATER SERVICE INTERRUPTION - Tagbilaran City

To our valued consumers,

Please be informed that the Admin Team will be conducting INTERCONNECTION WORKS of our newly installed pipelines located along Buhion Street, San Isidro District, Tagbilaran City.

The subject area will experience low to no water supply during the interruption schedule.

DATE: November 13, 2024
TIME: 05:00PM until 12:00MN

AFFECTED AREAS:
NO WATER SUPPLY - Cabawan, Tiptip, Parts of Manga
LOW PRESSURE - Parts of Ubujan, Taloto, and Booy
(Interconnection of 8-inch and 4-inch Pipelines)
ACTIVITY: (Interconnection of 8-inch and 4-inch Pipelines)

We sincerely apologize for the inconvenience this will cause you. We request your patience and understanding on this matter. Rest assured that the water supply will be back to normal once the interconnection work is done.

Posted on: Wednesday 6th of November 2024
By: Franz Tura

blog

Advisories

YOU MAY NOW CLAIM YOUR FREE CALENDAR

TO ALL OUR DEAR CONSUMERS:
YOU MAY NOW CLAIM YOUR FREE CALENDAR IN ANY OF OUR OFFICES (TAGBILARAN, DAUIS, PANGLAO)

NOTE: 1 CALENDAR PER ACCOUNT ONLY
(UNTIL SUPPLY LAST)

Posted on: Saturday 26th of October 2024
By: Franz Tura

blog

Advisories

IMPORTANT REMINDER TO OUR VALUED CONSUMERS

Please be informed that tapping in parallel using TEE-CONNECTION after the meter to another water service provider is STRICTLY PROHIBITED and ILLEGAL. If caught, your water service will be automatically DISCONNECTED.

Posted on: Saturday 19th of October 2024
By: Franz Tura

blog

Advisories

CPG NORTH AVENUE PIPELINE PROJECT UPDATES

CPG NORTH AVENUE PIPELINE PROJECT UPDATES

Richli Water would like to inform the public that concrete pouring on the second half of the road cut at Lower Sto. Niño Street corner CPG North Avenue was done on September 25, 2024.

This portion will be closed from September 25 to October 09 to make sure that the concrete is cured properly and the desired strength is met. Removal of traffic safety devices will be done on October 10, 2024, during which the full width of the road can be used by the traveling public. Until then, traffic disruption will still be experienced in the area.

We request everyone to bear with us during this time.

Thank you so much for understanding.

Posted on: Friday 4th of October 2024
By: Franz Tura

blog

Advisories

NOTICE OF WATER SERVICE INTERRUPTION | Tagbilaran City Area | September 30, 2024

To our valued consumers,

Please be informed that the Admin Team will be conducting an EMERGENCY LEAK REPAIR of our damaged 3-inch distribution pipeline along C. Mag-aso Street, Booy District, Tagbilaran City.

The subject area will experience low to no water supply during the interruption schedule.

DATE: September 30, 2024
TIME: 09:30 AM until 05:00 PM
AFFECTED AREAS: C. Mag-aso Street, G. Tanguenca Street, and O. Zamora Street, Booy
ACTIVITY: Emergency Leak Repair of Damaged 3-inch Pipeline
(Emergency Repair)

We sincerely apologize for the inconvenience this will cause you. Please know that we were not able to inform you ahead of time since this incident was unforeseen. We request your patience and understanding on this matter. Rest assured that the water supply will be back to normal once the repair works is done.

Posted on: Monday 30th of September 2024
By: Franz Tura



Page 1